1. Кіріспе

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2. Өнім аяқталдыview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

1 -сурет: Аяқталдыview of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. Жинақ құрамдас бөліктері

  • 2x 12V 1.2Ah Sealed Lead-Acid Batteries
  • Smart Charger Board
  • Электр сымдары
  • Battery Holder/Mounting Base
  • Монтаждау кронштейндері
  • Fasteners (screws, keys)
  • Нұсқаулық (бұл құжат)
Individual components of the BFT SB-BAT P125002 Battery Backup Kit

2-сурет: Егжей-тегжейлі view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. Үйлесімділік

This battery backup system is compatible with the following BFT gate operator series:

  • Deimos BT series of slide gate operators
  • VIRGO - LINX
  • EOS-SCE
  • HYDRA N
  • DEIMOS BT-QSC D-NETTUNO S
  • SB BAT/SB CARBAT (DEIMOS BT-SB 300)
  • BT BAT 2 (URANO BT ARES 1000 & ARES 1500)
  • NETTUNO B
  • VENERE D
  • АРГО
  • LIBRA C MA - LIBRA C LX

Ensure your gate operator model is listed above for proper functionality.

4. Орнату және орнату

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. Қауіпсіздік шаралары

  • Қуатты ажырату: Always turn off the main power supply to the gate operator before installation or maintenance.
  • Тиісті құралдар: Use appropriate tools for electrical connections and mounting.
  • Сымдар: Ensure all wiring connections are secure and correctly polarized.
  • Қоршаған орта: Install the kit in a dry, protected location, away from direct weather exposure.

4.2. Орнату қадамдары (Жалпы нұсқаулар)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. Батареяларды салыңыз: Place the two 12V 1.2Ah batteries into the battery holder.
  3. Батареяларды қосу: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. Қауіпсіз сымдар: Route and secure all wiring to prevent pinching or damage.
  6. Қуатты қалпына келтіру: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. Сынақ жүйесі: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. Пайдалану нұсқаулары

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2. Қуат Оуtage Operation (Power Off)

Қуат болған жағдайда utage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. Техникалық қызмет көрсету

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. Battery Recharging

Күштен кейінtage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12-14 сағат. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

Жүйеге а 20А сақтандырғыш for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. Батареяның қызмет ету мерзімі және ауыстыру

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7. Ақаулықтарды жою

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

  • No Power During Outage:
    • Барлық сым қосылымдарының қауіпсіз және дұрыс екенін тексеріңіз.
    • Check the 20A fuse.
    • Ensure batteries are fully charged. If recently discharged, allow 12-14 hours for recharging.
    • Батарея көлемін тексеруtage. If below 20.4V (exhausted battery protection threshold), batteries may need replacement.
  • Батареялар зарядталмайды:
    • Confirm main power supply to the gate operator is active.
    • Check all connections to the smart charger board.
    • Inspect the 20A fuse.
  • Reduced Operation Time:
    • Batteries may be aging and losing capacity. Consider replacement.
    • Ensure batteries are fully charged before testing.

For persistent issues, contact BFT technical support or a qualified service technician.

8. Техникалық сипаттамалар

ЕрекшелікТехникалық сипаттама
Үлгі нөміріP125002
Батарея ТүріТығыздалған қорғасын қышқылы
Батарея сыйымдылығы2x (12V 1.2Ah)
Шығу көлеміtage24V DC (nominal)
Зарядтау көлеміtage27.2В
Зарядтау тогы130мА
Батареяны қайта зарядтау уақыты12-14 сағат
Exhausted Battery Protection Threshold20.4В
Сақтандырғыш рейтингі20A
Жұмыс температурасыData detected with external temperature of: 25°C (77°F)

9. Кепілдік және қолдау

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT webең соңғы байланыс мәліметтері мен қолдау ресурстарына арналған сайт.

© 2023 BFT. All rights reserved. Information in this manual is subject to change without notice.

Қатысты құжаттар - P125002

Алдын алаview BFT DEIMOS BT UL/CSA Electromechanical Gate Automation System
Discover the BFT DEIMOS BT UL/CSA, an electromechanical automation system for rack sliding gates. Featuring smart technology, 24V safe operation, and simplified installation, this system enhances gate security and convenience. Explore its technical specifications and available accessories for residential and commercial applications.
Алдын алаview BFT Mitto 2M/4M қашықтан кодтау нұсқаулары: Кешенді нұсқаулық
BFT Mitto 2M және 4M қашықтан басқару құралдарын гараж мен қақпа ашатын құрылғыларға қалай бағдарламалау керектігін біліңіз. Бұл нұсқаулық сандық экрандары бар және онсыз қабылдағыштарды, соның ішінде маңызды қауіпсіздік ескертулерін кодтауды қамтиды.
Алдын алаview BFT VIRGO Swing Gate Automation Installation Manual
Comprehensive installation and user guide for the BFT VIRGO swing gate automation system, covering safety, technical specifications, installation procedures, programming, and maintenance.
Алдын алаview TOPENS автоматты қақпа ашқыштары - RK1200T, AT1202, A8131 Өнім аяқталдыview
RK1200T сырғанайтын қақпа ашқышын, AT1202 қос бұралмалы қақпа ашқышын және A8131 бір бұралмалы қақпа ашқышын қамтитын TOPENS автоматты қақпа ашқыштарының түрлерін зерттеңіз. Олардың сенімді мүмкіндіктері, қауіпсіздік артықшылықтары және кіреберіс жолын автоматтандыруға арналған сипаттамалары туралы біліңіз.
Алдын алаview BENINCA DU.350N жер асты бұралмалы қақпаны ашатын құрылғы - Техникалық сипаттамалар мен мүмкіндіктер
BENINCA DU.350N жерасты бұрылмалы қақпасы туралы толық ақпарат, оның ішінде техникалық сипаттамалар, мүмкіндіктер, орнату шектеулері және қолжетімді керек-жарақтар. Бұл берік және сенімді қақпа ашу құралы қарқынды пайдалануға арналған.
Алдын алаview BFT Cell Switch Prime GSM Gate Opener - Installation & User Manual
Detailed installation and user manual for the BFT Cell Switch Prime, a GSM cellular gate opener and alarm signalling device. Covers system overview, installation, programming via app and SMS, features, troubleshooting, and parameter lists.

Ask a question about this manual

Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.